What Every Engineer Should Know: Series Statement | p. xv |
Preface | p. xvii |
Author | p. xix |
Acknowledgments | p. xx |
List of Abbreviations | p. xxi |
Development Processes | p. 1 |
Introduction | p. 1 |
Concept and Market | p. 5 |
People and Disciplines | p. 7 |
Architecting and Architecture | p. 8 |
Phases of a Project | p. 16 |
Scheduling | p. 19 |
Documentation | p. 21 |
Requirements and Standards | p. 24 |
Analysis | p. 30 |
Design Trade-Offs | p. 31 |
Tests | p. 38 |
Integration | p. 42 |
Manufacturing | p. 44 |
Support | p. 45 |
Disposal | p. 47 |
Liability | p. 48 |
Priorities | p. 49 |
Summary | p. 49 |
References | p. 50 |
Variations on the Theme-Considerations for Mission-Critical Equipment and Medical Devices | p. 53 |
Development Processes | p. 53 |
People and Disciplines | p. 55 |
Architecting and Architecture | p. 55 |
Phases | p. 61 |
Scheduling | p. 65 |
Documentation | p. 66 |
Requirements and Standards | p. 66 |
Analysis | p. 70 |
Design Trade-Offs | p. 75 |
Tests | p. 84 |
Integration | p. 86 |
Manufacturing | p. 90 |
Support | p. 90 |
Disposal | p. 93 |
Liability | p. 93 |
Priorities | p. 93 |
Summary | p. 94 |
References | p. 94 |
Tools of the Trade | p. 97 |
Introduction | p. 97 |
Tools for Estimation and Feasibility | p. 97 |
Tools for Project Control | p. 102 |
Tools for Design | p. 104 |
Laboratory Equipment | p. 106 |
References | p. 109 |
Case Study 1-Major Appliances | p. 111 |
Concept and Market | p. 111 |
People and Disciplines | p. 113 |
Architecting and Architecture | p. 113 |
Phases | p. 115 |
Scheduling | p. 115 |
Documentation | p. 115 |
Requirements and Standards | p. 116 |
Analysis | p. 116 |
Design Trade-Offs | p. 116 |
Tests | p. 119 |
Integration | p. 119 |
Manufacturing | p. 119 |
Support | p. 120 |
Disposal | p. 121 |
Liability | p. 121 |
Summary | p. 121 |
Acknowledgment | p. 121 |
Case Study 2-Telecom Products | p. 123 |
Concept and Market | p. 123 |
People and Disciplines | p. 125 |
Architecting and Architecture | p. 125 |
Phases | p. 127 |
Scheduling | p. 128 |
Documentation | p. 128 |
Requirements and Standards | p. 130 |
Analysis | p. 131 |
Design Trade-Offs | p. 131 |
Tests | p. 133 |
Integration | p. 134 |
Manufacturing | p. 135 |
Support | p. 137 |
Disposal | p. 138 |
Liability | p. 139 |
Summary | p. 139 |
Acknowledgments | p. 139 |
Case Study 3-Commercial Laboratory Equipment | p. 141 |
Concept and Market | p. 141 |
People and Disciplines | p. 143 |
Architecting and Architecture | p. 144 |
Phases | p. 147 |
Scheduling | p. 156 |
Documentation | p. 156 |
Requirements and Standards | p. 158 |
Analysis | p. 159 |
Design Trade-Offs | p. 160 |
Tests | p. 165 |
Integration | p. 166 |
Manufacturing | p. 166 |
Support | p. 168 |
Disposal | p. 168 |
Liability | p. 168 |
Summary | p. 169 |
Acknowledgment | p. 169 |
References | p. 169 |
Case Study 4-Automobile Engine Controller | p. 171 |
Concept and Market | p. 171 |
People and Disciplines | p. 173 |
Architecting and Architecture | p. 173 |
Phases | p. 176 |
Scheduling | p. 176 |
Documentation | p. 177 |
Requirements and Standards | p. 177 |
Analysis | p. 179 |
Design Trade-Offs | p. 179 |
Tests | p. 182 |
Integration | p. 183 |
Manufacturing | p. 183 |
Support | p. 184 |
Disposal | p. 185 |
Liability | p. 185 |
Summary | p. 187 |
Acknowledgments | p. 187 |
References | p. 188 |
Case Study 5-Industrial Flowmeter | p. 189 |
Concept and Market | p. 189 |
People and Disciplines | p. 190 |
Architecting and Architecture | p. 191 |
Phases | p. 192 |
Scheduling | p. 193 |
Documentation | p. 193 |
Requirements and Standards | p. 194 |
Analysis | p. 194 |
Design Trade-Offs | p. 194 |
Tests | p. 199 |
Integration | p. 199 |
Manufacturing | p. 199 |
Support | p. 200 |
Disposal | p. 201 |
Liability | p. 201 |
Summary | p. 202 |
Acknowledgment | p. 202 |
Case Study 6-Military Support Equipment | p. 203 |
Concept and Market | p. 203 |
People and Disciplines | p. 206 |
Architecting and Architecture | p. 207 |
Phases | p. 208 |
Scheduling | p. 210 |
Documentation | p. 210 |
Requirements and Standards | p. 211 |
Analysis | p. 211 |
Design Trade-Offs | p. 212 |
Tests | p. 215 |
Integration | p. 217 |
Manufacturing | p. 217 |
Support | p. 218 |
Disposal | p. 218 |
Liability | p. 218 |
Summary | p. 218 |
Acknowledgment | p. 219 |
Reference | p. 219 |
Case Study 7-Designing Instruments for Space Flight | p. 221 |
Concept and Market | p. 221 |
People and Disciplines | p. 222 |
Architecting and Architecture | p. 223 |
Phases | p. 224 |
Scheduling and Estimating | p. 229 |
Documentation | p. 230 |
Requirements and Standards | p. 235 |
Analysis | p. 236 |
Design Trade-Offs | p. 239 |
Tests | p. 244 |
Integration | p. 245 |
Manufacturing and Fabrication | p. 250 |
Support | p. 260 |
Disposal | p. 260 |
Liability | p. 261 |
Summary | p. 261 |
Acknowledgments | p. 261 |
References | p. 262 |
Case Study 8-Aerospace Video Processor | p. 263 |
Concept and Market | p. 263 |
People and Disciplines | p. 265 |
Architecting and Architecture | p. 265 |
Phases | p. 267 |
Scheduling | p. 269 |
Documentation | p. 269 |
Requirements and Standards | p. 271 |
Analysis | p. 272 |
Design Trade-Offs | p. 272 |
Tests | p. 274 |
Integration | p. 275 |
Manufacturing | p. 275 |
Support | p. 276 |
Disposal | p. 276 |
Liability | p. 276 |
Summary | p. 277 |
Acknowledgment | p. 277 |
Case Study 9-Satellite Subsystem | p. 279 |
Concept and Market | p. 279 |
People and Disciplines | p. 280 |
Architecting and Architecture | p. 281 |
Phases | p. 282 |
Scheduling and Estimating | p. 283 |
Documentation | p. 283 |
Requirements and Standards | p. 288 |
Analysis | p. 289 |
Design Trade-Offs | p. 289 |
Tests | p. 299 |
Integration | p. 299 |
Manufacturing and Fabrication | p. 300 |
Support | p. 300 |
Disposal | p. 300 |
Liability | p. 301 |
Summary | p. 301 |
Acknowledgments | p. 301 |
References | p. 301 |
Case Study 10-Programmer for Implanted Stimulators | p. 303 |
Concept and Market | p. 303 |
People and Disciplines | p. 306 |
Architecting and Architecture | p. 307 |
Phases | p. 309 |
Scheduling | p. 311 |
Documentation | p. 311 |
Requirements and Standards | p. 313 |
Analysis | p. 316 |
Design Trade-Offs | p. 323 |
Tests | p. 327 |
Integration | p. 328 |
Manufacturing | p. 328 |
Support | p. 329 |
Disposal | p. 329 |
Liability | p. 329 |
Summary | p. 330 |
References | p. 331 |
Case Study 11-Implanted Medical Devices | p. 333 |
Concept and Market | p. 333 |
People and Disciplines | p. 334 |
Architecting and Architecture | p. 338 |
Phases | p. 342 |
Scheduling | p. 349 |
Documentation | p. 349 |
Requirements and Standards | p. 354 |
Analysis | p. 359 |
Design Trade-Offs | p. 361 |
Tests | p. 367 |
Integration | p. 370 |
Manufacturing | p. 371 |
Support | p. 373 |
Disposal | p. 373 |
Liability | p. 374 |
Summary | p. 374 |
Acknowledgment | p. 375 |
References | p. 375 |
Summary Comparisons Across the 11 Case Studies | p. 377 |
Comparing the Case Studies | p. 377 |
Market | p. 378 |
People and Disciplines | p. 379 |
Architecting and Architecture | p. 380 |
Scheduling | p. 381 |
Documentation and Processes | p. 381 |
Requirements and Standards | p. 382 |
Analyses | p. 383 |
Design Trade-Offs | p. 383 |
Test and Integration | p. 390 |
Manufacturing | p. 390 |
Support and Service | p. 391 |
Liability | p. 392 |
Some Observations on Architectural Trade-Offs in Selected Real-Time Systems | p. 393 |
Some Thoughts | p. 393 |
Indicating System for a Parking Garage | p. 393 |
Data Acquisition System for Biological Monitoring | p. 404 |
Gun Fuzing System | p. 407 |
Summary | p. 411 |
References | p. 412 |
Some Observations about Consumer Appliances | p. 413 |
Concept and Market | p. 413 |
Product Teardown Summaries | p. 414 |
Coffeemaker Teardown | p. 414 |
Remote Control Teardown | p. 428 |
Hobbies, Arts, and Crafts | p. 432 |
Common Appliance Problems | p. 434 |
Summary | p. 435 |
References | p. 438 |
Some Observations about User Interfaces | p. 439 |
Why Are User Interfaces so Important? | p. 439 |
Basic Principles for User Interfaces | p. 439 |
Vending Machine faux pas | p. 441 |
Appliance Display faux pas | p. 442 |
Remote Control faux pas | p. 444 |
Boombox faux pas | p. 446 |
Handheld Chemical Agent Sensors | p. 446 |
Summary | p. 452 |
References | p. 453 |
Index | p. 455 |
Table of Contents provided by Ingram. All Rights Reserved. |